SCORPION® 2 Pan + Dough Probe with Bake Cycle S-Curve Analysis
SCORPION® 2 Pan + Dough Probe with Bake Cycle S-Curve Analysis
SKU:PAN-189da5
Achieve precise baking profiles with SCORPION® 2 Pan + Dough Probe's dual probe design & automatic S-Curve analysis.
Regular price
$249.99
Regular price
Sale price
$249.99
Unit price
per
Delivery via Maden
Expect your order to arrive on time.
Secure Payments
All orders are processed through a secure, PCI-compliant checkout.
The SCORPION® 2 Pan + Dough Probe revolutionizes baking quality assurance with its dual probe design. This innovative unit accurately captures the critical pan/dough interface temperature and dough core temperature, essential for achieving optimal baking profiles. Bakers rely on the SCORPION® Software Version 8 for automatic S-Curve data point calculations, enhancing precision in ingredient adjustments and temperature settings. Ideal for quality assurance, production consistency, equipment performance analysis, food safety optimization, and new product development, this probe ensures reliable and repeatable results unattainable with hand-placed thermocouples.

Product Specifications
Applications
Quality AssuranceRecord your processing conditions when your product quality is within specification. Save these profiles for future reference as "target" conditions. Use the SPC function included in the software to establish upper and lower control limits for your process temperature, air velocity, heat flux and humidity profiles.Line Start-upTake a SCORPION® 2 profile a few minutes before introducing product into a process. This is a good check that the process has reached the correct operating conditions before production is started.Product Consistency Line-to-LineCompare SCORPION® 2 profiles for two process ovens, perhaps in different factories, that are supposed to be making the same product.Commissioning and MaintenanceHeat process ovens usually include dampers and other controls that must be set by the installation engineer. Use SCORPION® 2 to check that these have been set correctly. Repeat the profiles as part of your preventative maintenance program to detect drift in zone conditions and to pin-point the cause of problems when they do occur.Analyze Equipment PerformanceMost oven manufacturers now use SCORPION® 2 to design their heat processes. This is an invaluable tool for design engineers to balance heat and airflow across the width and along the length of the process oven.Optimize Food Safety and ThroughputControlling internal food temperature is key to achieving food safety. Today's food processors must also document how they are meeting food safety requirements with data. The SCORPION® 2 Data Logging Measurement System makes both jobs easier.The SCORPION® 2 Data Logger with R&D Smart Sensor and Product Probes simplifies the measurement of environment temperature, airflow, energy transfer and internal product core temperature. Plus the SCORPION® 2 Software (SV8) calculates and displays the % kill for a specified pathogen reduction level.By combining this ease of measurement with robust data capture, the SCORPION® 2 System enables better process optimization. No other system makes achieving desired levels of food safety and throughput so simple.New Product DevelopmentUse SCORPION® 2 to record the processing conditions you develop in the lab or in a pilot plant. Then use SCORPION® 2 again to establish the same conditions as the new product is transferred to a full-scale production line.
Specifications Bake Cycle S Curve Analysis
Bakers rely on Bake Cycle S-Curve Analysis to optimize the baking profile. This analysis provides critical insight needed to make adjustments to ingredients, bake time, and zone temperature settings. SCORPION® Software Version 8 (SV8) automatically calculates the three key S-Curve data points: Yeast Kill, Gelatinization and Arrival.
Specifications Height
3 in
Specifications Material
Copper | Stainless Steel